AUTRY TECH DRAFTING/DESIGN
WEEK 14 - BARNOMINIUMS
DUE BY THE END OF NEXT WEEK
-
PROJECT 3A15P (200PTS)
RESOURCE
lecture notes
Metal buildings are cheaper than normal construction.
Bolt ups buildings
-
designed with whole foot measurements
-
have to consider column locations 20' to 30' O.C. 25' is the idea size.
-
walls are thicker around a 1'
-
slop of roof are 4/12 or 12/3
weld ups buildings
-
designed with whole foot measurements have a little more flexibility on sizes.
-
are cheaper than bolt up
-
have to consider column locations about 12' O.C.
-
walls are thinner than bolt ups
-
the slop of the roof is 4/12 or 12/3
Pole barns
-
Have a little more flexibility on sizes.
-
have to consider column locations about 8' O.C.
-
walls are thinner than bolt ups
-
the slop of the roof is 4/12 or 12/3