Due the end of week 5.
-
80 pts - 1/2 Drawings
-
20 pts - List of 20 commands
Due the end of week 5.
-
80 pts - 1/2 Drawings
-
20 pts - List of 20 commands
Due the end of week 5.
-
80 pts - 1/2 Drawings
-
20 pts - List of 20 commands
Due the end of week 4.
-
100 pts - Assignment 1
​
Due the end of week 5.
-
100 pts - Assignment 2
Due the end of week 9.
-
20 pts - Per Assignment Exercise
​
Due the end of week 9.
-
20 pts - Per Assignment Exercise
​
AUTRY TECH DRAFTING/DESIGN
WEEK 10 - PLUMBING
DUE BY THE END OF THIS WEEK
-
ASSIGNMENT 3A10 (20PTS)
ASSIGNMENTS
RESOURCE
Read Chapter 22 and 23 on page 359. Answer the question below and enter it into OPEN LMS under 3A10
​
1. Provides unheated water to plumbing fixtures.
​
2. Connects the hot water main (from water heater) to each
​
3. Stacks with closets draining into them.
​
4. Sewage from a house enters this receptacle first.
​
5. Water treatment device in which canisters filled with granules trap contaminants such as chlorine and pesticides.
​
6. Exterior part of the house drain.
​
7. Main drain pipe that receives water and waste from all stacks.
​
8. Permits air into the drainage system.
​
9. A container that receives liquid sewage from the septic tank and disperses it evenly throughout the disposal field.
​
10. Water treatment device in which line pressure forces water through a thin, semipermeable membrane.
​
​
​
​
​
​
​
​
A. Activated
B. Cold water main
C. House drain
D. Hot water branch
E. House sewer
F. Reverse osmosis
G. Main stacks
H. Septic tank
I. Distribution box
J. Vent stack
​
​
​
​
Draw an plumbing plan for this project.