Due the end of week 5.
-
80 pts - 1/2 Drawings
-
20 pts - List of 20 commands
Due the end of week 5.
-
80 pts - 1/2 Drawings
-
20 pts - List of 20 commands
Due the end of week 5.
-
80 pts - 1/2 Drawings
-
20 pts - List of 20 commands
Due the end of week 4.
-
100 pts - Assignment 1
Due the end of week 5.
-
100 pts - Assignment 2
Due the end of week 9.
-
20 pts - Per Assignment Exercise
Due the end of week 9.
-
20 pts - Per Assignment Exercise
AUTRY TECH DRAFTING/DESIGN
WEEK 15 - STRUCTURAL DRAWINGS
DUE BY THE END OF THIS WEEK
-
ASSIGNMENT 3M15W (20PTS)
Read Chapter 25 on page 828. Answer the question below and enter into OPEN LMS under 3M15W
1. Steel, as shipped from the mill, is referred to as
A. plain material.
B. base material.
C. shapes.
D. coils.
E. sections.
2. The tolerance that indicates permissible deviation from published contours and dimensions is
A. shop.
B. field.
C. finished.
D. mill.
E Fabrication.
3. Detail drawings depicting individual steel members are called
A. field drawings.
B. fabrication drawings.
C. shop drawings.
D. setup drawings.
E. installation drawings.
4. _____ dimensioning is used on structural drawings.
A. Unidirectional
B. Tabular
C. Baseline
D. Aligned
E. none of the above
5. Elevations detail dimension are known as
A. beam column
B. column
C. member
D. setups
E. bracket
6. A _____ is a convenient erection unit
A. beam
B. column
C. member
D. support
E. bracket
7. Bolt pitch is the
A. stragger offset.
B. edge to bolt row distance.
C. distance between bolt holes.
D. distance between bolt rows.
E. row to row distance.
8. A member's attachment shapes and means of fastening is called
A. the connection plate.
B. the attachment plate.
C. the seat.
D. stringer.
E. none of the above.
9. In structural drafting detail drawings, fillets are
A. shown and dimensioned.
B. shown and dimensioned by local note.
C. shown but not dimensioned.
D. dimensioned by general note but not shown.
E. usually omitted.
10. Section views in structural drafting
A. include hidden lines in the view.
B. use intermittent hatching.
C. never indicate the materials by using a pattern hatch.
D. omit the cross hatching.
E. none of the above.
11. Dimensions of the beams in structural drafting are
A. centerline to center lines
B. edge to edge
C. edge to centerline.
D. omitted.
E. none of the above.
12. The calculated mass of pieces is used to
A. calculated the load on erection equipment.
B. from the basis for making up loads.
C. from the basis of payment for shipping.
D. determine the type of transport equipment required.
E. all of the above.