AUTRY TECH DRAFTING/DESIGN
ARCHITECTURE DESIGN PROJECT
Instructions:
The city of Enid is wanting to open a new water park. You will need to create pool two main pool a kid pool with a water playground in the middle. A bigger pool with slides with water slides. We will also need an obstacle course area that could be included with the main pool or separate. We will need a lazy river. We will also need a building also.
The theme is costal architecture. They want landscaping and trees in between pools.
​
​
Building needs
1. Maximum 5,500 SQ. FT.
2. Cashier and check in covered and not air-condition
3. Two offices with and employee lounge with private restrooms and lockers.
4. Male and female restroom with changing rooms.
5. Concession/with food storage
6. Event room
7. First Aid Room
8. lockers
​
Large pool needs
1. Maximum 7’000 SQ. FT.
2. The 4 water slides entering pools
​
​
Kids pool needs
1. Maximum 5’000 SQ. FT.
2. Water playground in the middle
​
​
Lazy River needs
1. 900’ Max. length
2. Can have bridges going over the river.
​
​
​
Obstacle course pool needs
1. Maximum 2’000 SQ. FT.
Please follow company standards and create the sheets below.
Floor plans
Site plans
Exterior elevations
Interior elevations
Electrical plans
Roof Plan